26
Apr
Residence at Junikowo
All works started with measuring the humidity of concrete, air, parquet, floor tempera...
26
Apr
Rehabilitation centre Wiejce Castle, near Miedzychod
Building: Rehabilitation centre Wiejce Castle, near Miedzychod
Designer: Zbigniew Cic...
26
Apr
Junior High School no. 21
Building: Junior High School no. 21
General contractor: MARBUD Mariusz Oleksy
Sub-contract...
26
Apr
QUALITY HOTEL in Sweeden
Building: QUALITY HOTEL in Sweeden
General contractor: Stein Verno-Sweden and "Malwin...
26
Apr
Poznan University of Technology, Piotrowo Street, Poznan
Building: Poznan University of Technology, Piotrowo Street, Poznan
General contractor...
26
Apr
Oiling
Laying joints and boards, scraping, stopping, polishing, oiling with a polisher (3 times) Area: 3000...
26
Apr
Interleaving
Removing the old parquet, removing the dust, laying new parquet (clamping wood flooring with a naili...
26
Apr
ADRIA – Scraping, polishing, two-time varnishing
Scraping, polishing, two-time varnishing with PRIME varnish and three-time TRAFFIC varnish. Area: 30...
26
Apr
Staining
Laying parquet with synthetic glue (s 760 BONA), scraping, polishing, two-time staining and and thre...
26
Apr
Residency at Podolany
Edgings - priming with Maximus GP primer, laying parquet according to the project with two-component...
26
Apr
Hotel, 1500 m2 floor panels
Hotel 1500 m2
Hotel, 1500 m2 floor panels grinding concrete floors to remove the remains of gypsu...